Menu

Diamond Alluvial Ore Beneficiation Production Line and Process Flow

OreSolution provides full-flow solutions for diamond alluvial beneficiation production line, using advanced processes such as crushing, screening, gravity separation, X-ray electrowinning, oil paste separation, etc. to recover diamonds efficiently. Customized design maximizes diamond integrity, and manufacturers directly supply equipment and technology!

 

⏰ 24/7 Online · Free Consultation!

📞 +86 199 1475 4015 (WeChat/WhatsApp)

Submit your inquiry now to receive a customized solution and quote!

 

Model: {{ product.model }}
weight: {{ product.weight }} Kilogram

{{ variable.name }}

{{ value.name }}
Product Inquiry

Diamond Alluvial Ore Beneficiation Production Line and Process Solution

Diamond Washing Production Line, Diamond Alluvial Beneficiation Process, Diamond Beneficiation Equipment

Process Overview

Diamond alluvial beneficiation production line adopts the mature "washing-screening-jigging-oil separation" process route, especially designed for river alluvial and seaside diamond alluvial ores. This diamond washing production line is designed to realize high recovery rate of diamonds through multi-stage sorting and selecting process, while ensuring the integrity of diamond crystals.

Diamond Alluvial Ore Beneficiation Process

  1. Washing and screening system

    • Rotary scrubber: removes clay and surface adherents

    • Vibrating Screen: Classifies into four grades: +10mm, 10-5mm, 5-2mm, 2-0.5mm.

  2. Jigging Roughing System

    • 0-10mm jigger: processing fine-grained materials

    • 0-30mm jigger: processing coarse-grained materials

    • Each jigger produces rough concentrate and tailings.

  3. Oleomargarine Concentration System

    • Vibrating Oil Paste Concentrator: Processes jigged rough concentrate

    • Produce final diamond concentrate and tailings

Diamond Washing Production Line Main Equipment Configuration

Process Segment Equipment Name Technical Parameters Processing capacity
Ore washing Rotary scrubber Speed 5-15rpm 20-300t/h
Screening Double-deck vibrating screen Sieve hole adjustable 30-200t/h
Roughing 0-10mm jigger Stroke 10-25mm 5-35t/h
Roughing 0-30mm jigger Stroke 20-40mm 10-30t/h
Concentration Vibrating oil paste concentrator Oil belt width 800mm 1-3t/h

Diamond Production Line Technical Advantages

  1. High recovery rate

    • Multi-stage sorting process ensures the recovery rate >95%.

    • Adapt to 0.5-30mm full grain size recovery

  2. Crystal protection

    • Gentle treatment process

    • Specialized anti-damage equipment design

  3. Economical and environmentally friendly

    • No chemical additives

    • Water recycling rate >85%.

    • Oil paste can be reused

Typical technical indicators

Item Indicator
Processing capacity 10-300t/h
Raw Ore Grade 0.1-5 carat/ton
Recovery rate ≥95%
Water consumption ≤1.5m³/t
Oil paste consumption ≤0.5kg/t

Technical service

  1. Preliminary services

    • Diamond beneficiation process design

    • Diamond beneficiation equipment selection and configuration

  2. Mid-term Service

    • Diamond washing production line equipment manufacturing and supply

    • Installation and commissioning guidance

    • Operation training

  3. Later Service

    • Process optimization and upgrading

    • Equipment maintenance

    • Technical consulting service

We can provide customized diamond alluvial beneficiation production lines and process solutions according to the characteristics of different diamond alluvial ores (particle size distribution, associated minerals, etc.) to ensure the best economic benefits and diamond recovery rate.

CONTACT US

To find out more about our products and solutions, please fill out the form below and one of our experts will get back to you shortly.

Nginx server needs to configure pseudo-static rules, click View configuration method